{"id":7715,"date":"2024-05-08T15:02:44","date_gmt":"2024-05-08T13:02:44","guid":{"rendered":"https:\/\/arc.com.ly\/?p=7715"},"modified":"2024-05-08T15:02:45","modified_gmt":"2024-05-08T13:02:45","slug":"prequalification-for-inspection-of-aboveground-underground-of-submarine-pipelines-2","status":"publish","type":"post","link":"https:\/\/arc.com.ly\/?p=7715&lang=en","title":{"rendered":"Prequalification for inspection of aboveground, underground of submarine pipelines"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"7715\" class=\"elementor elementor-7715\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-232ed114 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"232ed114\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-6df51768\" data-id=\"6df51768\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-2fca1662 elementor-widget elementor-widget-text-editor\" data-id=\"2fca1662\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\n<p class=\"wp-block-paragraph\" dir=\"ltr\">Azzawiya Oil Refining Company Inc. (ARC), a subsidiary of National Oil Corporation (NOC) is located on Mediterranean coast almost 50 km to the west of Tripoli. The refinery is equipped with a marine terminal containing three mooring berths. Berths (1,3) single buoy mooring (SBM) of single anchor leg mooring (SALM) type, while berth (2) is conventional buoy mooring (CBM). ARC intends to carryout inspection of the aboveground, underground and submarine portions of the pipelines to berth (1,2,3) by (intelligent tethered inspection tool technology).<\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\" dir=\"ltr\">List of the documents required to be submitted for the prequalification:<\/p>\n\n\n\n<ol class=\"wp-block-list\" type=\"1\">\n<li>Introduction of the company\/contractor highlighting the specialized field of activities.<\/li>\n\n\n\n<li>Valid licenses for carrying out company.<\/li>\n\n\n\n<li>Statement of approved company\u2019s financial status for the last three years (including annual budget).<\/li>\n\n\n\n<li>Company\u2019s technical staff organization chart and equipment list, including list of proposed personnel assigned for this project with brief CV\u2019s.<\/li>\n\n\n\n<li>Contact details i.e. address of the company\u2019s head office and branch in Libya if available, telephone, email address, official website etc.<\/li>\n\n\n\n<li>Detailed list of past and current projects (especially similar projects) executed by the company with owners, locations, contract prices etc.<\/li>\n\n\n\n<li>Certificate of completion for similar projects in the past.<\/li>\n\n\n\n<li>Full information about joint venture\/subcontractors, if any, with their experience in similar projects (complete profiles).<\/li>\n\n\n\n<li>Authority letter from the parent company in the event of prequalification of a branch or partner company.<\/li>\n<\/ol>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t<div class=\"elementor-element elementor-element-8be9fc7 e-flex e-con-boxed e-con e-parent\" data-id=\"8be9fc7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-62ca8a7 elementor-widget elementor-widget-text-editor\" data-id=\"62ca8a7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The companies\/contractors willing to take part in the prequalification process are required to submit their documents with a copy of this advertisement stamped by the company\/contractor by 07 May 2024 to the following:<\/p>\n<p><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-870ea5d e-flex e-con-boxed e-con e-parent\" data-id=\"870ea5d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ac6b6d1 elementor-widget elementor-widget-text-editor\" data-id=\"ac6b6d1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p style=\"text-align: center;\"><strong>The secretary, Tenders Committee<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Office No. 11B, Main Administration Building<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Azzawiya Oil Refining Company Inc.<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Azzawiya-Libya<\/strong><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-bf1201e e-flex e-con-boxed e-con e-parent\" data-id=\"bf1201e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-822d9b9 elementor-widget elementor-widget-text-editor\" data-id=\"822d9b9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>For any inquires please do not hesitate to contact the Tender Committee at:<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0 Tel\/Fax:00218237628670<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0 Email:\u00a0 <a href=\"mailto:tenders_committee@arc.com.ly\">tenders_committee@arc.com.ly<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Azzawiya Oil Refining Company Inc. (ARC), a subsidiary of National Oil Corporation (NOC) is located on Mediterranean coast almost 50 km to the west of Tripoli. The refinery is equipped with a marine terminal containing three mooring berths. Berths (1,3) single buoy mooring (SBM) of single anchor leg mooring (SALM) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6059,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[291],"tags":[],"class_list":["post-7715","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bids_advertisements_english"],"_links":{"self":[{"href":"https:\/\/arc.com.ly\/index.php?rest_route=\/wp\/v2\/posts\/7715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arc.com.ly\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arc.com.ly\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arc.com.ly\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/arc.com.ly\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7715"}],"version-history":[{"count":5,"href":"https:\/\/arc.com.ly\/index.php?rest_route=\/wp\/v2\/posts\/7715\/revisions"}],"predecessor-version":[{"id":7720,"href":"https:\/\/arc.com.ly\/index.php?rest_route=\/wp\/v2\/posts\/7715\/revisions\/7720"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arc.com.ly\/index.php?rest_route=\/wp\/v2\/media\/6059"}],"wp:attachment":[{"href":"https:\/\/arc.com.ly\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arc.com.ly\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arc.com.ly\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}